25 Years of Delivering Excellence & Value 15
CHESAPEAKE SAFETY BOATS
(804) 436-4338
www.chesapeakesafetyboats.com
422 Chesapeake Drive
White Stone, VA 22578
Congratulations,
AI Engineers!
Congratulations,
AI Engineers!
Full-service bridge inspection and construction projects
- Safety Boats
- Operators
- Barges
- Man lifts
Fully licensed and insured!
I-95 over Oil Mill Road, Waterford, CT
Congratulations to
AI Engineers
on your 25th Anniversary
From your friends at
Davidoff Hutcher & Citron LLP
605 Third Avenue
New York, NY 10158
(212) 557-7200
www.dhclegal.com
of the existing bridge. When that is built,
we literally slide the new bridge in." said
Mr. Pradhan. The process takes place
over four weekends, he said, with milling
and paving work done at night.
The $11 million Stratford bridge
project, U.S. Route 1 over the Metro-North
Railroad, marked the first time AI put ABC
to work on a geosynthetic reinforced
soil-integrated bride system (GRS-IBS). The
three-span structure, which sees about
18,000 cars a day, will be replaced with
a single span with four lanes of traffic.
To reduce traffic disruptions, AI will
design soil abutments to be constructed
while the bridge is still in place. When the
soil reaches a certain height, the existing
bridge will be removed, said Mr. Prad
-
han. The new span being built alongside
will then be placed onto the new GRS-IBS.
"It's a multi-stage construction," said Mr.
Pradhan, "but construction time will be min-
imized with plenty of motorist notice and
advanced signage posting along the way."
he said. It's the first time AI has tried the
technique on this significant of a structure.
Route 1 over Metro-North RR,
Stratford, CT