Mainebiz

June 27, 2022

Issue link: https://nebusinessmedia.uberflip.com/i/1471410

Contents of this Issue

Navigation

Page 9 of 27

V O L . X X V I I I N O. X I I I J U N E 2 7 , 2 0 2 2 10 BUILDING BUSINESS BY PETER BY PETER VAN ALLEN VAN ALLEN CONTRACTORS SHIFT TO NEW PROJECTS Contractors around Maine are showing their mettle by making the transition from one major project to the next. Allied-Cook Construction, which is nearing the finish line with the Covetrus headquar- ters on Portland's East End, is now doing framing on the 39,000-square-foot Phoenix Flats project just a few blocks away, at 83 Middle St. It will offer 45 units of afford- able housing for seniors 62 years old or older, plus the disabled. It was designed to meet PassiveHouse certification. The building owner is Community Housing of Maine. Along with Scarborough-based Allied-Cook as construction manager, the architect is CWS Architecture + Interior Design, civil engineer is Terradyn Consultants LLC, structural engineer and PassiveHouse consultant is Thornton Tomasetti, mechanical and elec- trical engineer is Bennett Engineering. Financing was provided by MaineHousing and Bangor Savings Bank (which has a branch next door). Fall completion is expected. Another contractor making a shift is Freeport-based Zachau Construction. As it winds down construction on the L.L.Bean headquarters, adjacent to the old HQ now being razed), it is doing framing on Phase I of the Front Street Redevelopment, at 34 W. Presumpscot St. in Portland. The site, on what had been a public housing development, will have 113 units of mixed- income housing. Partners in the housing project are Portland Housing Authority, Portland Housing Development Corp., Utile, MaineHousing, Bath Savings, Cross Surety, the U.S. Department of Housing and Urban Development, the city of Portland, Drummond Woodsum, FHLBank Boston, RBC Capital Projects and Development Services of New England. NEWS FROM AROUND THE CONSTRUCTION INDUSTRY MWHoss is doing the renovations and fit-out of the Goodfire Brewing site in South Freeport. Optimum Construction Co. is doing the fit-out of the Dok Mali Thai Kitchen, at 47 India St. in Portland. The site was formerly Lois' Natural Marketplace. Construction of the Hallowell Townhouse Condos, at 211 Water St., is being led by Jim Pepin Homes LLC. The six-unit devel- opment is being financed by Skowhegan Savings Bank. PM Construction is on target for a year-end completion of the Daymark condo build- ing, with 54 units, at 75 Chestnut St. ENGAGED. EMPOWERED. TEAM HANCOCK. www.HancockLumber.com/Careers TEAM HANCOCK EMPLOYEE HIGHLIGHT: SARAH DUBE COUNTER PRO "Ten years ago I was looking for a summer job, so I applied at Hancock Lumber. I ended up really liking it a lot. I enjoy being in the smaller setting, learning more about the customer, and the projects they are working on. Oftentimes I find you can help people out quite a bit. We really take pride in ensuring the customer leaves here with what they need." —Sarah Dube P H O T O / P E T E R VA N A L L E N P H O T O / P E T E R VA N A L L E N P H O T O / P E T E R VA N A L L E N Allied-Cook Construction is well into the framing of Phoenix Flats in Portland. Zachau Construction is the project manager for Phase I of the Front Street Development MWHoss is doing the fit-out of the Goodfire Brewing in South Freeport.

Articles in this issue

Links on this page

Archives of this issue

view archives of Mainebiz - June 27, 2022