Mainebiz

July 27, 2020

Issue link: https://nebusinessmedia.uberflip.com/i/1272107

Contents of this Issue

Navigation

Page 25 of 35

V O L . X X V I N O. X V I I J U LY 2 7 , 2 0 2 0 26 R E A L E S T A T E / C O N S T R U C T I O N / E N G I N E E R I N G K evin French sits in a cramped conference room in a Westbrook industrial building and tries to capture the previous two months. "What we've done here is some- thing I've never heard of, never been part of before," says the vice president of Landry/French Construction. To the layperson, the 126,072-square- foot building at 5 Bradley Drive is just one of many big industrial boxes in the 5 Star Industrial Park. To French, it's the embodiment of the defining project of his company's 10-year history. It's July 9, the day after the Scarborough-based construction com- pany was issued a certificate of occu- pancy for the building it is renovating for Abbott Laboratories (NYSE: ABT), a Chicago-based company with sales of $31.9 billion last year. Abbott, which has a site in Scarbor- ough, is expanding production of its rapid COVID-19 tests, and needs the production space. It leased the building this spring from Calare Properties LLC, which bought it for $8.75 million. When French got a call in late April from Abbott saying they wanted him to look at a building they were thinking of fitting out, French was happy to comply. e construction firm, celebrating its 10th anniversary this summer, and Abbott go way back. Abbott was Landry/French's first customer, and they're currently also partnering on an expansion on Abbott's Scarborough campus. French took a look at the building, which had been an Olympia Sports distribution center. It had a maze of con- veyor belts and was set up for distribu- tion, not for producing diagnostic devices. French says dismantling that type of building and fitting it out for the kind of production Abbott does takes a year or more. is one had to be done in two months. On May 8, the day after Calare closed, Landry/French was on site. Everything had to come out. "We needed a shell to work with," French says. "We were going to have to build from scratch." at involved taking down the tangle of conveyor belts then building half a P H O T O / T I M G R E E N WAY Doing the 'impossible' When Abbott had to ramp up COVID-19 test production, its contractor squeezed a year-long job into two months B y M a u r e e n M i l l i k e n F O C U S Kevin French, executive vice president at Landry/French Construction, left, with Craig Piper, principal at SMRT, with architects from SMRT and Landry/French Construction team members, at the new Abbott Laboratories site in Scarborough — a project that would normally take a year that was accomplished in two months. What we've done here is something I've never heard of, never been part of before. — Kevin French Landry/French Construction

Articles in this issue

Archives of this issue

view archives of Mainebiz - July 27, 2020